Habitat Surveys
CHaMP- Scientific Protocol for Salmonid Habitat Surveys within the Columbia Habitat Monitoring Program (CHaMP)
CHaMP is designed as a Columbia River basin-wide habitat status and trends monitoring program built around a single protocol with a programmatic approach to data collection and management (RM&E Workgroup 2010). CHaMP will result in the collection and analysis of systematic habitat status and trends information that will be used to assess basin-wide habitat conditions. When coupled with biological response indicators, this status and trends information will be used to evaluate habitat management strategies. This program will be integrated with ongoing Pacific Northwest Aquatic Monitoring Program (PNAMP) recovery planning efforts and will be part of the collaborative process across Columbia Basin fish management agencies and tribes and other state and federal agencies that are monitoring anadromous salmonids and/or their habitat. The implementation of CHaMP will characterize stream responses to watershed restoration and/or management actions in at least one population within each steelhead and spring Chinook Major Population Group (MPG) which have, or will have, “fish-in” and “fish-out” monitoring (identified in RPA 50.6), thereby meeting the requirements of RPA 56.3, RPA 57, and RPA 3. CHaMP was designed to deliver trends in habitat indicators and requires that monitoring occurs for three cycles of a sampling panel (see section 1.6), at least 9 years.
Spatial Design
Data Collection Methodology
- Air Temperature Sensor Installation v1.0
- Channel Class v1.0
- Channel Segment Number v2.0
- Channel Unit Classification v1.0
- Channel Unit Supplemental Data v1.0
- Fish Cover Elements v1.0
- Large Woody Debris v1.0
- Locating the Site v1.0
- Macroinvertebrate Drift v1.0
- Ocular Channel Unit Substrate Composition v1.0
- Particle Size Distribution and Particle Embeddedness v1.0
- Riparian Structure v1.0
- Setting Up Topographic Survey v1.0
- Site Layout v1.0
- Site Map v1.0
- Site Photos v1.0
- Solar Input v1.0
- Stream Discharge v1.0
- Topographic Point Collection v1.0
- Water Chemistry – Conductivity and Alkalinity v1.0
- Water Temperature Probe Installation v1.0
Data Analysis Methodology
- Channel Unit Large Wood Volume Calculation v1.0
- D16, D50, and D84 Particle Size in Riffles Calculation v1.0
- Drift Biomass Calculation v1.0
- Fastwater Cobble Embeddedness Calculations v1.0
- Large Wood Frequency v1.0
- Large Wood Volume Calculation v1.0
- Percent Big Tree Cover v1.0
- Percent Coniferous Cover v1.0
- Percent Fish Cover Calculation v1.0
- Percent Ground Cover and Percent No Ground Cover v1.0
- Percent Non-Woody Cover v1.0
- Percent Understory Cover and Percent No Understory Cover v1.0
- Percent Woody Cover v1.0
- Pool Tail Fines: Particles <2mm and <6mm v1.0
- RBT – Bankfull Area Calculation v1.0
- RBT – Bankfull Site Length Calculation v1.0
- RBT – Bankfull Width Profile Calculation v1.0
- RBT – Bankfull Width To Depth Ratio Profile Calculation v1.0
- RBT – Channel Unit Calculation v1.0
- RBT – Integrated Bankfull Width Calculation v1.0
- RBT – Integrated Wetted Width Calculation v1.0
- RBT – Site Gradient Calculation v1.0
- RBT – Site Sinuosity Calculation v1.0
- RBT – Thalweg Depth Profile Calculation v1.0
- RBT – Thalweg Site Length Calculation v1.0
- RBT – Wetted Area Calculation v1.0
- RBT – Wetted Site Length Calculation v1.0
- RBT – Wetted Volume Calculation v1.0
- RBT – Wetted Width Profile Calculation v1.0
- RBT – Wetted Width To Depth Ratio Profile Calculation v1.0
- Site Discharge Calculation v1.0
- Site Measurement of Alkalinity Calculation v1.0
- Site Measurement of Conductivity Calculation v1.0
- Stream Temperature Logger Calculations v1.0
- Substrate Composition Calculations (Boulder, Cobbles, Gravel, Sand and Fines) v1.0
Note for Drift Invertebrate Method:
CHaMP recognizes that collaborators may also choose to optionally collect benthic macroinvertebrates. If benthic macroinvertebrates are collected, we recommend that collaborators implement sampling methods outlined in “Methods for the collection and analysis of benthic macroinvertebrate assemblages in wadeable streams of the Pacific Northwest” (PNAMP 2007; https://www.monitoringmethods.org/Protocol/Details/44). In essence, the PNAMP protocol calls for sampling a total of 8 ft2 from riffle or fast water habitats throughout the reach, composited from eight individual 1 ft2 samples selected randomly or systematically using a D-frame kick net, Surber, or Hess sampler.
i. Sample timing.
a. Samples should be collected during base flow only (e.g., July 15 – September 30) compared to the recommended period from July 1 – October 15 in order to control for the effects of stream flow and seasonality of macroinvertebrate communities.
ii. Laboratory processing.
a. When subsampling is used, the recommended number of organisms sampled is 500 compared to the suggested minimum of 300 organisms.
b. The taxonomic resolution of sampling to the “lowest practical level” should be determined by the research question or biotic index intended for use.
c. If subsampling is used, processing should include a 10-min search for large and rare organisms, but organisms found during the search should be recorded separately from other data.
Spatial Design
Data Collection Methodology
- Air Temperature Sensor Installation v1.0
- Channel Class v1.0
- Channel Segment Number v1.0
- Channel Unit Classification v2.0
- Field Method for Benthic Macroinvertebrate Sampling in Wadeable Streams v1.0
- Fish Cover Elements v2.0
- Locating the Site v2.0
- Macroinvertebrate Drift v1.0
- Ocular Channel Unit Substrate Composition v1.0
- Particle Size Distribution and Particle Embeddedness v2.0
- Pool Tail Fines Grid v1.0
- Riparian Structure v2.0
- Setting Up Topographic Survey v1.0
- Site Layout v2.0
- Site Map v1.0
- Site Photos v2.0
- Site Revisit v1.0
- Solar Input v2.0
- Stream Discharge v1.0
- Tally Large Woody Debris v2.0
- Topographic Point Collection v2.0
- Undercut Banks v1.0
- Water Chemistry – Conductivity and Alkalinity v1.0
- Water Temperature Probe Installation v1.0
Data Analysis Methodology
- D16, D50, and D84 Particle Size in Riffles Calculation v2.0
- Drift Biomass Calculation v1.0
- Fastwater Cobble Embeddedness Calculations v1.0
- Large Wood Frequency v1.0
- Large Wood Volume Calculation v1.0
- Percent Big Tree Cover v1.0
- Percent Canopy Cover and Percent No Canopy Cover v1.0
- Percent Coniferous Cover v2.0
- Percent Fish Cover Calculation v1.0
- Percent Ground Cover and Percent No Ground Cover v1.0
- Percent Non-Woody Cover v1.0
- Percent Understory Cover and Percent No Understory Cover v1.0
- Percent Woody Cover v1.0
- Pool Tail Fines: Particles <2mm and <6mm v1.0
- RBT – Bankfull Area Calculation v1.0
- RBT – Bankfull Site Length Calculation v1.0
- RBT – Bankfull Width Profile Calculation v1.0
- RBT – Bankfull Width To Depth Ratio Profile Calculation v1.0
- RBT – Channel Unit Calculation v1.0
- RBT – Integrated Bankfull Width Calculation v1.0
- RBT – Integrated Wetted Width Calculation v1.0
- RBT – Site Gradient Calculation v1.0
- RBT – Site Sinuosity Calculation v1.0
- RBT – Thalweg Depth Profile Calculation v1.0
- RBT – Thalweg Site Length Calculation v1.0
- RBT – Wetted Area Calculation v1.0
- RBT – Wetted Site Length Calculation v1.0
- RBT – Wetted Volume Calculation v1.0
- RBT – Wetted Width Profile Calculation v1.0
- RBT – Wetted Width To Depth Ratio Profile Calculation v1.0
- Site Discharge Calculation v1.0
- Site Measurement of Alkalinity Calculation v1.0
- Site Measurement of Conductivity Calculation v1.0
- Solar Access Calculation v1.0
- Stream Temperature Logger Calculations v1.0
- Substrate Composition Calculations (Boulder, Cobbles, Gravel, Sand and Fines) v1.0
- Undercut Metrics v1.0
Spatial Design
Data Collection Methodology
- Channel Segment Number v2.0
- Channel Unit Classification v2.0
- Fish Cover Elements v2.0
- Locating the Site v2.0
- Macroinvertebrate Drift v2.0
- Ocular Channel Unit Substrate Composition v1.0
- Particle Size Distribution and Particle Embeddedness v3.0
- Pool Tail Fines Grid v2.0
- Riparian Structure v2.0
- Setting Up Topographic Survey v1.0
- Site Layout v2.0
- Site Map v1.0
- Site Photos v2.0
- Site Revisit v1.0
- Solar Input v2.0
- Stream Discharge v1.0
- Tally Large Woody Debris v3.0
- Topographic Point Collection v2.0
- Undercut Banks v2.0
- Water Chemistry – Conductivity and Alkalinity v1.0
- Water Temperature Probe Installation v1.0
Data Analysis Methodology
- D16, D50, and D84 Particle Size in Riffles Calculation v2.0
- Drift Biomass Calculation v1.0
- Fastwater Cobble Embeddedness Calculations v1.0
- Large Wood Frequency v1.0
- Large Wood Volume Calculation v1.0
- Percent Big Tree Cover v1.0
- Percent Canopy Cover and Percent No Canopy Cover v1.0
- Percent Coniferous Cover v2.0
- Percent Fish Cover Calculation v1.0
- Percent Ground Cover and Percent No Ground Cover v1.0
- Percent Non-Woody Cover v1.0
- Percent Understory Cover and Percent No Understory Cover v1.0
- Percent Woody Cover v1.0
- Pool Tail Fines: Particles <2mm and <6mm v1.0
- RBT – Bankfull Area Calculation v1.0
- RBT – Bankfull Site Length Calculation v1.0
- RBT – Bankfull Width Profile Calculation v1.0
- RBT – Bankfull Width To Depth Ratio Profile Calculation v1.0
- RBT – Channel Unit Calculation v1.0
- RBT – Integrated Bankfull Width Calculation v1.0
- RBT – Integrated Wetted Width Calculation v1.0
- RBT – Site Gradient Calculation v1.0
- RBT – Site Sinuosity Calculation v1.0
- RBT – Thalweg Depth Profile Calculation v1.0
- RBT – Thalweg Site Length Calculation v1.0
- RBT – Wetted Area Calculation v1.0
- RBT – Wetted Site Length Calculation v1.0
- RBT – Wetted Volume Calculation v1.0
- RBT – Wetted Width Profile Calculation v1.0
- RBT – Wetted Width To Depth Ratio Profile Calculation v1.0
- Side Channel Calculations v1.0
- Site Discharge Calculation v1.0
- Site Measurement of Alkalinity Calculation v1.0
- Site Measurement of Conductivity Calculation v1.0
- Solar Access Calculation v1.0
- Stream Temperature Logger Calculations v1.0
- Substrate Composition Calculations (Boulder, Cobbles, Gravel, Sand and Fines) v1.0
- Undercut Metrics v1.0
Spatial Design
Data Collection Methodology
- Channel Segment Number v3.0
- Channel Unit Classification v3.0
- Fish Cover Elements v2.0
- Locating the Site v2.0
- Macroinvertebrate Drift v2.0
- Measuring Individual Large Woody Pieces v1.0
- Ocular Channel Unit Substrate Composition v1.0
- Particle Size Distribution and Particle Embeddedness v3.0
- Pool Tail Fines Grid v2.0
- Riparian Structure v2.0
- Setting Up Topographic Survey v1.0
- Site Layout v2.0
- Site Map v1.0
- Site Photos v2.0
- Site Revisit v1.0
- Solar Input v2.0
- Stream Discharge v1.0
- Topographic Point Collection v3.0
- Undercut Banks v2.0
- Water Chemistry – Conductivity and Alkalinity v1.0
- Water Temperature Probe Installation v1.0
Data Analysis Methodology
- D16, D50, and D84 Particle Size in Riffles Calculation v2.0
- Design based estimation of status and trend of Columbia Habitat and Monitoring Program metrics v1.0
- Drift Biomass Calculation v1.0
- Estimating Stream Temperatures at Multiple Scales Using Remotely Sensed Land Surface Temperature v1.0
- Fastwater Cobble Embeddedness Calculations v1.0
- Hydraulic Modeling of River and Stream Reaches Sampled in the Columbia Habitat and Monitoring Program v1.0
- Large Wood Frequency v1.0
- Large Wood Volume Calculation v1.0
- Percent Big Tree Cover v1.0
- Percent Canopy Cover and Percent No Canopy Cover v1.0
- Percent Coniferous Cover v2.0
- Percent Fish Cover Calculation v1.0
- Percent Ground Cover and Percent No Ground Cover v1.0
- Percent Non-Woody Cover v1.0
- Percent Understory Cover and Percent No Understory Cover v1.0
- Percent Woody Cover v1.0
- Pool Tail Fines: Particles <2mm and <6mm v1.0
- RBT – Bankfull Area Calculation v1.0
- RBT – Bankfull Site Length Calculation v1.0
- RBT – Bankfull Width Profile Calculation v1.0
- RBT – Bankfull Width To Depth Ratio Profile Calculation v1.0
- RBT – Channel Unit Calculation v1.0
- RBT – Integrated Bankfull Width Calculation v1.0
- RBT – Integrated Wetted Width Calculation v1.0
- RBT – Site Gradient Calculation v1.0
- RBT – Site Sinuosity Calculation v1.0
- RBT – Thalweg Depth Profile Calculation v1.0
- RBT – Thalweg Site Length Calculation v1.0
- RBT – Wetted Area Calculation v1.0
- RBT – Wetted Site Length Calculation v1.0
- RBT – Wetted Volume Calculation v1.0
- RBT – Wetted Width Profile Calculation v1.0
- RBT – Wetted Width To Depth Ratio Profile Calculation v1.0
- Side Channel Calculations v1.0
- Site Discharge Calculation v1.0
- Site Measurement of Alkalinity Calculation v1.0
- Site Measurement of Conductivity Calculation v1.0
- Solar Access Calculation v1.0
- Stream Temperature Logger Calculations v1.0
- Substrate Composition Calculations (Boulder, Cobbles, Gravel, Sand and Fines) v1.0
- Undercut Metrics v1.0